Highlights
This Old House

This Old House - Season 35 (2013)

Audience Score
57

Season 35 Plot

Jersey Shore Rebuilds 2013; Arlington 2014

This Old House Season 35 aired on October 5th, 2013.

Season 35 Episodes

1. Jersey Shore Rebuilds 2013 Part 1: Sandy and the Jersey Shore

October 5th, 2013

For the first time, This Old House takes on three homes at the same time. The team meets the homeowners and discusses rebuilding stronger, smarter, and safer.

2. Jersey Shore Rebuilds 2013 Part 2: Drastic Measures

October 12th, 2013

The team discusses how FEMA impacts building requirements, and foundation options. The Manasquan home is razed. Kevin takes a tour of Bay Head. Trouble begins at Point Pleasant.

3. Jersey Shore Rebuilds 2013 Part 3: Getting to Work

October 19th, 2013

The Mantoloking home is examined from a new angle while the Bay Head house begins framing. The team learns about a innovative foundation to be used on the Point Pleasant home. And the shows visits a business in Bay Head that has already successfully rebuilt.

4. Jersey Shore Rebuilds 2013 Part 4: Built for Speed

October 26th, 2013

The show visits the boardwalk at Seaside Heights to view reconstruction. The Bay Head home has a new deck installed. The Point Pleasant project gets crushed! A visit to the factory that will make the Manasquan house in only one week.

5. Jersey Shore Rebuilds 2013 Part 5: Lines in the Sand

November 2nd, 2013

The windows are installed at the Bay Head house. At Point Pleasant a new dinning room is installed in place of the garage. And the modular home arrives on site in Manasquan.

6. Jersey Shore Rebuilds 2013 Part 6: Go With the Flow

November 9th, 2013

Breakaway walls and flood vents are installed at the Point Pleasant. The work on the modular home continues. What plants and trees survived Sandy?

7. Jersey Shore Rebuilds 2013 Part 7: Stories From Sea Level

November 16th, 2013

Footings are added in Bay Head home. Point Pleasant gets stone veneer, fiber-cement siding and composite decking. Manasquan project is finished. Pro surfer Sam Hammer visits the show. And marine biologist Chris Wojcik talks about the bay.

8. Jersey Shore Rebuilds 2013 Part 8: One Year Later

November 23rd, 2013

A tour of the Mantoloking project. And the wrap party for the Jersey Shore projects.

9. Arlington 2014: Part 1: A New Project

January 2nd, 2014

The crew begins work on Italianate-style home originally dating to 1872.

10. Arlington 2014: Part 2: Old House Discoveries

January 9th, 2014

Richard visits a water tank that has been disguised as a Greek temple. During demolition, the crew finds traces of the past. Roger moves a rhododendron .

11. Arlington 2014: Part 3: Concrete Jungle

January 16th, 2014

Kevin, Norm, Tom, and mason Mark McCullough replace the substandard foundation by pouring a new slab and curb, all while preserving the antique fieldstone foundation. The crew also finds headroom and original plaster details in the living room.

12. Arlington 2014: Part 4: Quest for a Dry Basement

January 23rd, 2014

Tom joins the home's new roof to the existing. Architect David The architect explains how much change an 200 additional square feet the house. The existing fieldstone foundation gets additional repairs and waterproofing. Roger tours a nearby Garden. Norm and Tom repair the front door.

13. Arlington 2014: Part 5: Getting to Level

February 1st, 2014

Leveling the ceiling in the kitchen and the floor in the finished basement is explained. An opening for a new window is cut. Landscape architect Cricket Beauregard explains what to do with a shady front yard.

14. Arlington 2014: Part 6: Additional Details

February 8th, 2014

The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.

15. Arlington 2014: Part 7: Arlington Heights

February 15th, 2014

Selective tree pruning occurs in the yard. Inside, Richard explains the choice between PEX and copper for water supply lines. Kevin tours an 1872 Stick Style home.

16. Arlington 2014: Part 8: Italianate Inspiration

February 22nd, 2014

Exterior colors are proposed. A tour of a nearby 1870 Italianate style home. Richard shows a more attractive approach to PVC vents. Tom shows his favorite applications for radiant heat.

17. Arlington 2014: Part 9: Deadliest Old House?

March 1st, 2014

A "Deadliest Catch" star drops by to help with plaster cracks. Making the second floor railing safer.

18. Arlington 2014: Part 10: Old World New World

March 8th, 2014

Installing steps with ice. More plaster repairs. The use of 3D-printing for home repair. Review of the front porch design.

19. Arlington 2014: Part 11: House vs. Nature

March 15th, 2014

A hydrangea that is damaging the foundation is removed. Painting with red paint. How to keep the basement dry.

20. Arlington 2014: Part 12: Water Water Everywhere

March 22nd, 2014

A visit to Spy Pond in Massachusetts. A new water main is installed. Chestnut flooring is selected. Fiberglass gutters that appear appropriate to the historical period are installed.

21. Arlington 2014: Part 13: Brick, Trim and Tile

March 29th, 2014

A sidewalk is prepared. Custom moldings are installed. Tiles are picked by the homeowner. New doors and countertops are installed.

22. Arlington 2014: Part 14: Soapstone, Marble, Oval Picture Frame

April 5th, 2014

Adding the final edge detail to soapstone countertops; cutting down 12-inch marble tiles for wainscoting; oval mirror frame; oak stair treads; darkening soapstone countertops with carnauba wax and walnut oil.

23. Arlington 2014: Part 15: Made in the Shade

April 12th, 2014

Installing a custom PVC fence and arbor; creating a marble herringbone pattern in the powder room; grout options for the faux slate floor in the mudroom; building a sliding barn door; alternatives to the usual shade plants.

24. Arlington 2014: Part 16: Decorative Details

April 19th, 2014

A teak island top is installed in the kitchen; a vanity top is added to the master bath; an electronics nook is built; the pebble tiles on the shower floor are grouted; handmade wallpaper is hung; and a new front door is installed.

25. Arlington 2014: Part 17: Sod, Garbage Disposers, Crown Molding

April 26th, 2014

A truckload of fresh sod is rolled out; a replica ceiling medallion made with a 3D printer and a custom copper vent hood are installed; a garbage disposer is selected; a pedestal sink is installed in the powder room; and storage space in the master closet is maximized. Also: a lesson in crown molding.

26. Arlington 2014: Part 18: Italianate Renaissance

May 3rd, 2014

The Arlington Italianate project concludes with a look at how the master bath was modified to accommodate a steam shower; a tour of the basement, bedrooms, baths and laundry spaces; and an overview of the decor choices.

All Seasons

Season 47
Sep 25, 2025
Season 46
Sep 26, 2024
Season 45
Sep 28, 2023
Season 44
Sep 29, 2022
Season 43
Sep 30, 2021
Season 42
Oct 4, 2020
Season  41
Oct 5, 2019
Season 40
Oct 6, 2018
Season 39
Oct 5, 2017
Season 38
Sep 30, 2016
Season 37
Oct 3, 2015
40
Season 36
Oct 4, 2014
Season 35
Oct 5, 2013
Season 34
Oct 4, 2012
Season 33
Oct 6, 2011
Season 32
Oct 7, 2010
Season 31
Oct 10, 2009
Season 30
Oct 2, 2008
Season 29
Oct 4, 2007
Season 28
Oct 5, 2006
Season 27
Oct 6, 2005
Season 26
Oct 9, 2004
Season 25
Oct 11, 2003
Season 24
Oct 10, 2002
Season 23
Sep 22, 2001
Season 22
Sep 23, 2000
Season 21
Sep 25, 1999
Season 20
Sep 26, 1998
Season 19
Sep 27, 1997
Season 18
Sep 28, 1996
Season 17
Sep 30, 1995
Season 16
Jan 1, 1994
Season 15
Sep 2, 1993
Season 14
Jan 1, 1992
Season 13
Sep 5, 1991
Season 12
Sep 1, 1990
Season 11
Jan 1, 1989
Season 10
Sep 1, 1988
Season 9
Jan 1, 1987
Season 8
Oct 16, 1986
Season 7
Oct 10, 1985
Season 6
Oct 5, 1984
Season 5
Oct 1, 1983
Season 4
May 15, 1982
Season 3
Jan 1, 1982
Season 2
Jan 1, 1981
Season 1
Jan 1, 1979
Specials
Aug 17, 2019