Highlights
Home Again with Bob Vila

Home Again with Bob Vila - Season 2 (1991)

Season 2 Episodes

1. Split-level Ranch: Selecting the House

September 2nd, 1991

A new project is introduced: the renovation of a 17-year-old ranch-style house in Plymouth, Mass. Included: a look at other homes in Plymouth.

2. Split-level Ranch: Demolition and Remodeling

September 9th, 1991

The deck and front entryway are demolished. Also: a look at an architect's computer-generated plans for the house.

3. Split-level Ranch: Framing and Demolition

September 16th, 1991

Construction begins on the front entryway; the old bathroom fixtures are removed.

4. Split-level Ranch: Septic System, Bathroom Fixtures and Windows

September 23rd, 1991

Work begins on the new bathroom; a window and roof trim are added to the entryway. Also: landscaping plans.

5. Split-level Ranch: Paint Prep, Attic Louver and French Doors

September 30th, 1991

A broken storm window is replaced; tile work is started in the bathroom; a bathroom vanity is installed. Also: a tour of a tile factory in Florida.

6. Split-level Ranch: Bay Window and Cabinet Doors

October 7th, 1991

Installed: a bay window in the dining room; cabinet doors in the kitchen. Also: a tour of a country-style kitchen in Nantucket, Massachusetts.

7. Split-level Ranch: Counters, Deck and Vinyl Floor

March 10th, 2026

Installed a laminated kitchen countertop, and a vinyl floor. Also, the exterior is painted and a backyard deck is started.

8. Split-level Ranch: Fireplace and Deck

October 21st, 1991

Colonial-style molding and a mantelpiece are installed in the living room; the backyard deck is completed. Also: a visit to the home of John Adams (1735-1826) in Quincy, Massachusetts.

9. Split-level Ranch: Masonry and Floor

October 28th, 1991

A masonry barbecue is repaired; the basement remodeling begins.

10. Split-level Ranch: Installing Wallpaper, Door and Paneling

November 4th, 1991

A decorator offers suggestions on choosing wallpaper; a paperhanger demonstrates his craft in the living room. Also: a floor is installed in the family room; a front door is crafted.

11. Split-level Ranch: Light Fixture Wiring and Trellis

November 11th, 1991

Wiring is installed for a Colonial-style light fixture and a the refrigerator's icemaker is hooked up. Also: a trellis is constructed in the front yard.

12. Split-level Ranch: Plate Rack Construction

November 18th, 1991

Bob constructs a plate rack for the dining room and shops for carpet for the living room. Outside, shrubs are transplanted, perennials are planted and the lawn is sodded.

13. Split-level Ranch: House Tour

November 25th, 1991

The finished house is toured, including the basement rec room, and the designer discusses the Colonial decor. Also: a look at the outside elements such as landscaping, gutters and a trellis.

14. Cracker Cottage: Selecting and Touring the House

December 2nd, 1991

Bob goes hunting for a house to remodel in Naples, Florida. He tours the 'Cracker' cottage he plans to renovate, then looks at similar, recently revamped cottage for inspiration.

15. Cracker Cottage: Outdoor Work and Planning

December 9th, 1991

A landscaper transplants a frangipani tree. Also: termite damage is checked.

16. Cracker Cottage: Demolition and Roof Brackets

December 16th, 1991

The architect presents her plans; the contractor explains the demolition process.

17. Cracker Cottage: Installing a Door and Removing Paint

December 23rd, 1991

Included: a visit to a salvage yard in search of doors and lavatories. Demonstrated: how to wash peeling paint from exterior siding.

18. Cracker Cottage: Paint Prep, Attic Louver and French Doors

December 30th, 1991

Demonstrated: smoothing out exterior siding using spackle; replacing an attic louver; and installing French doors in the entryway.

19. Cracker Cottage: Swimming Pool and Drywall Ceiling

January 27th, 1992

Included: the pool is tiled; drywall is installed in the living room; the carport is made into a garden area. Also: a visit to the development project in New York.

20. Cracker Cottage: Cabinets, Ceiling Fan and Porch Screen

February 3rd, 1992

Installed: kitchen cabinets; screening and a ceiling fan on the porch. Also: an update on the New York tenement project.

21. Cracker Cottage: Installing Windows and Shower

February 6th, 1992

Included: replacing porch windows and constructing a tongue-and-groove deck. Also: a shower-drain installation begins.

All Seasons

Season 15
Sep 13, 2004
Season 14
Sep 8, 2003
Season 11
Sep 4, 2000
Season 10
Sep 6, 1999
Season 9
Sep 7, 1998
Season 8
Sep 1, 1997
Season 7
Sep 2, 1996
Season 6
Sep 4, 1995
Season 5
Sep 5, 1994
Season 3
Sep 7, 1992
Season 2
Sep 2, 1991
Season 1
Sep 3, 1990